Quantcast

SE Bluegrass News

Saturday, September 21, 2024

Bridge repair scheduled for Berea Road/US 25 in Madison County Lane closure at milepoint 13.90

Bridge repair scheduled for Berea Road/US 25 in Madison County

Lane closure at milepoint 13.90

LEXINGTON, Ky. (Sept. 27, 2022) – The Kentucky Transportation Cabinet (KYTC) advises motorists of scheduled bridge repair work for Berea Road/US 25. A temporary lane closure will be necessary for patching of the bridge deck.

Tuesday, Sept. 27 – 6:30 p.m. until 12 a.m. (midnight)

Berea Road/US 25

• a lane closure will be in effect at milepoint 13.90

• motorists will be able to pass through the work zone

Original source can be found here.

ORGANIZATIONS IN THIS STORY

!RECEIVE ALERTS

The next time we write about any of these orgs, we’ll email you a link to the story. You may edit your settings or unsubscribe at any time.
Sign-up

DONATE

Help support the Metric Media Foundation's mission to restore community based news.
Donate

MORE NEWS